Tuesday, April 26, 2022

wall putty quantity calculation |estimate of wall putty | wall putty coverage area per kg

wall putty quantity calculation |estimate of wall putty | wall putty coverage area per kg 


wall putty :

दोस्तो यह वीडियो में दिखाया गया है कि wall putty ki quantity कैसे निकली जाती है । और वॉल पुट्टी की मोटाई कितनी होनी चाहिए । एक कमरे में कितने किलो putty लगेगी । यह सब इस वीडियो में दिखाया गया है।

नीचे दिए गए सभी प्वाइंट यह वीडियो में बताए गए है ।

how much putty needed for 10'× 10' Room 

wall putty quantity

how much area can 1kg wall putty cover ?

estimate and coverage area of wall putty

wall putty quantity calculation formula

how do you calculate wall putty ?

How much wall putty required for one room

wall putty price 40kg 

wall putty thickness

wall putty cost per sq ft


उम्मीद है यह वीडियो में आपको बहुत कुछ सीखने को मिलेगा । वीडियो अच्छी लगे तो लाइक और शेयर जरूर करे धन्यवाद ।


#civilfieldengineer #wallputty #puttywork #wallpainting #painting #buildingconstruction #civilengineering 

Civil field engineer

painting work in civil engineering








Thursday, April 21, 2022

Technical specifications of road embankment constructions | civil field engineer

Technical specifications of road embankment constructions | civil field engineer


This video is about embankment specifications. What things should be kept in mind while doing embankment layer and what technical things you should know about embankment .


Embankment Specifications

INTRODUCTION : 
An embankment refers to a volume of earthen material that is placed and compacted for the purpose of raising the grade of a roadway (or railway) above the level of the existing surrounding ground surface. A fill refers to a volume of earthen material that is placed and compacted for the purpose of filling in a hole or depression. Embankments or fills are constructed of materials that usually consist of soil, but may also include aggregate, rock, or crushed paving material.

Website : 
https://ersukhwinders3.blogspot.com

YouTube link :
https://youtube.com/channel/UCkp8da46BbnG8uoZcRUtH2g

Civil Field Engineer



Wednesday, April 20, 2022

technical specifications of road | Granular Sub Base (GSB) Road construction

Technical specifications of road | Granular Sub Base (GSB) Road construction 

Granular Sub Base : 
Granular Sub Base (GSB) consists of laying and compacting well graded material on prepared sub-grade in accordance with the specifications,GSB layer is intermediate layer in between Subgrade and Wet mix macadam. GSB layer is laid in roads and higway works due to its properties .

Gsb road construction process

Civil Field Engineer

 

technical specifications road work | wet mix macadam (WMM) road construction process


Technical specifications road work | wet mix macadam (WMM) road construction process 


wet mix macadam specification

WMM FOUNCTION : 
It is generally used as a base course of Flexible Pavement.
WMM provides a uniform and strong support, high resistance to deformation and distress .

TECHNICAL POINTS :
If the surface found high or low than top 75mm shall be scarified .
If the gsb layer surface is found to be dry, water shall be sprinkled before laying of wmm.
Level tollrance +- = 10mm
The speed of roller during compaction shall not exceed 5kmph .

In this video you will get complete information about WMM and you will also get technical things, which will be useful in your site work. 

Civil field engineer



Technical specifications road work | road slope calculation formula

 


Technical specifications road work | road slope calculation formula


technical specifications road work | road slope calculation formula | road construction process

how to calculate slope in road construction

#civilfieldengineer #road #roadwork 

Road slope formula 

Civil Field Engineer

Wednesday, April 13, 2022

Auto level surveying | auto level reading calculation


What is Auto Level for?

A dumpy level, builder's auto level, leveling instrument, or automatic level is an optical instrument used to establish or verify points in the same horizontal plane. It is used in surveying and building with a vertical staff to measure height differences and to transfer, measure and set heights.


auto leveling machine :-

In this video I'm talking about road leveling, how to use auto level at site and how to give road level on site, i hope you will learn in this video very important points .



Civil field engineer 


Tuesday, April 12, 2022

Top 7 civil engineering interview questions | Civil field engineer

 


Top 7 civil engineering interview questions | Civil field engineer

Civil engineer interview
civil engineering basic knowledge | civil engineering jobs interview

In this video I have mentioned top 7 civil engineer interview questions and answers
What every civil engineer should know , i hope you will definitely like this video and Share with your friends


Civil field engineer 

Saturday, April 9, 2022

What is d2/162 and d2/533 | d2/162 derivation | unit weight of reinforcement bar


What is d2/162 and d2/533 | d2/162 derivation | unit weight of reinforcement bar 


All this point mentioned in this video :
in the formula d2/162 if d is in mm then weight will be in ?
d2/162 and d2/533 difference
d2/162 calculation
d2 material weight calculator

D2/162 : 
दोस्तो यह वीडियो में दिखाया गया है कि D2/162 और D2/533 क्या है । और दोनो में क्या फर्क है। साथ ही यह भी दिखाया गया है। सरिए का वजन कैसे निकाला जाता है । उम्मीद है यह वीडियो भी आपको बहुत कुछ सीखा देगी धन्यवाद ।

Civil Field Engineer

Wednesday, April 6, 2022

auto level surveying | building survey | survey of building with auto level | civil field engineer

auto level surveying | building survey | survey of building with auto level | civil field engineer


What is the difference between auto level and dumpy level?

In the dumpy level, to level the bubble, one has to keep the bubble parallel to two leveling screws and then right angle to the third screw. In the auto level, the bubble can be adjusted from any side and any angle with any 3 screws available. The line of sight is manually adjusted in the dumpy level.


What is Auto Level for?

A dumpy level, builder's auto level, leveling instrument, or automatic level is an optical instrument used to establish or verify points in the same horizontal plane. It is used in surveying and building with a vertical staff to measure height differences and to transfer, measure and set heights.



Civil field engineer

Saturday, April 2, 2022

cutting length of circular stirrups | how to calculate cutting length of stirrups in column


 

stirrups :

दोस्तो यह वीडियो में दिखाया गया है। कि आप सर्कुलर कॉलम (Circular Column)की कटिंग लेंथ कैसे निकाल सकते है। कैसे गोल कॉलम के सरिए (Steel) की कटिंग लेंथ मापी जाती है। उम्मीद है यह वीडियो आप को बहुत कुछ सीखा देगी ।

वीडियो को अपने सभी दोस्तों के साथ शेयर करे ता जो वो भी सीख सके ।
धन्यवाद ।

Civil field engineer

Longitudinal Profile of Road - The L Section

  Longitudinal Profile of Road - The L Section Watch this video completely, your tension will be reduced by 80% in road work . Civil field e...

Civil Field Engineer