I have created this page for civil engineering study, in which you will get complete information about civil engineering and field work. thankyou !
Tuesday, March 29, 2022
stone masonry retaining wall estimate | type of stone masonry wall | stone masonry wall calculation
Monday, March 28, 2022
concrete grades and mix ratio - concrete slump range
concrete grades and mix ratio - concrete slump range
Civil engineering basic knowledge - civil engineering interview questions
Concrete basics civil engineering
The concrete should not be thrown from a height of 1m.
Sand having a moisture content of more than 5% should be used for concrete mix.
A cube test is carried out for each 30 cm3 usage of concrete.
![]() |
| Grade of concrete & mix ratio |
Ready-mix concrete, the concrete is made at the factory and transported to the site, this type of concrete is used where there is a lack of space for mixing the concrete and used where a huge amount of concrete is required for construction.
Adding more water in the concrete mix to increase setting time leads to the cracks or honeycomb in hardened concrete.
The thickness of DPC Should not be less than 2.5 cm.
Impermeability of concrete The concrete that resists the entry of water or moisture into it.
The concrete can be lifted to a maximum height of 50m using concrete pumps. The curing period of RCC is 25 days.
M20 grade concrete is generally used in the construction of the slab.
Grade of concrete :
Concrete :
Normal Grade of Concrete
M5 1:5:10
M7.5 1: 4: 8
M10 1 : 3: 6
M15 1:2:4
M20 1:1.5:3
M25 1:1:2
Standard Grade of Concrete
M35 Design Mix
M40 Design Mix
M45 Design Mix
High Strength Concrete Grades
M50 Design Mix
M55 Design Mix
M60 Design Mix
M65 Design Mix
Civil field engineer
how to calculate number of bricks for wall | bricks calculation | bricks quantity calculation
how to calculate number of bricks for wall | bricks calculation | bricks quantity calculation
How to calculate no of bricks in 1m3
Friends, in this video, brick work has been mentioned, in which you will get to learn a lot, how to find out the quantity of brick work, brick calculation in wall, brick work calculation in feet also mentioned.
Saturday, March 26, 2022
BBS (Bar bending schedule) of road drain | Road drainage construction
BBS (Bar bending schedule) of road drain | Road drainage construction
Friday, March 25, 2022
Auto level surveying in hindi | auto level reading calculation-part 4 | civil field engineer
Auto level surveying in hindi | auto level reading calculation-part 4 | civil field engineer
Auto level machine :
Dear Civil Engineering Students,
in this video it has been told that how to give sewer line level by auto level machine,And how to give sewerage slope, apart from this how to find RL by auto level
Civil field engineer
Tuesday, March 22, 2022
Bar bending schedule | bbs of beam | Beam reinforcement details @Civil Field Engineer
Bar bending schedule | bbs of beam | Beam reinforcement details @Civil Field Engineer
how to make bbs of beam
how to calculate quantity of steel in beam
In this video I have mentioned about RCC beam, in which the drawing of the beam has been told and how much bar will be used in the beam, it is also shown, Apart from this how to calculate cutting length of Stirrups
Civil field engineer
Monday, March 21, 2022
Bar bending schedule trapezoidal footing reinforcement | bbs
Bar bending schedule trapezoidal footing reinforcement | bbs
Civil field engineer
Saturday, March 19, 2022
ogl in road construction || surveying in civil engineering
ogl in road construction || surveying in civil engineering
auto level surveying in hindi | original ground level (ogl) survey road construction process | civil field engineer
Auto level surveying in hindi | original ground level (ogl) survey road construction process | civil field engineer
Tuesday, March 15, 2022
auto level se reading kaise karen | auto level reading calculation | auto level surveying in hindi
auto level se reading kaise karen | auto level reading calculation | auto level surveying in hindi
Monday, March 14, 2022
quantity of asphalt for road construction | bitumen asphalt road
Quantity of asphalt for road construction | bitumen asphalt road
Sunday, March 13, 2022
how to read auto levelling staff in hindi | auto level staff
How to read auto levelling staff in hindi | auto level staff
Saturday, March 12, 2022
Bar Bending Schedule of Column Footing | how to calculate quantity of steel in footing
Bar Bending Schedule of Column Footing
Thursday, March 10, 2022
Monday, March 7, 2022
column load calculation | column self load | load calculation for column
column load calculation | column self load | load calculation for column
Friday, March 4, 2022
Civil engineering interview questions and answers 1
Civil engineering interview questions and answers 1
Civil field engineer
Longitudinal profile of road | l section of road | civil field engineer
Longitudinal profile of road | l section of road
Longitudinal Profile of Road - The L Section
Longitudinal Profile of Road - The L Section Watch this video completely, your tension will be reduced by 80% in road work . Civil field e...
Civil Field Engineer
-
ogl in road construction || surveying in civil engineering original ground level survey ogl in road construction Surveying auto level roa...
-
O.G.L. Survey In Road Work || auto level surveying.how to find RL from auto level #civilfieldengineer levelling, surveying, autolevel दोस...